Automation of Load Electricity Operating System Using PLC (Programmable Logic Controller)
Jakabaring PLTS on-grid with a capacity of 2 MW operates from 6:00 am to 5:00 pm. At 5:00 pm the PLTS connection to the load will be disconnected and replaced with PLN. If the PLN is off due to damage or during maintenance, a generator that is operated manually will be used. Problems in the […]